ensuite refit

Ensuite refit We stripped back all the old tiles from the walls. Plasterboarded the ceiling, built a false wall and lighting plinth. We installed cabling for new LED lights, shower fan and digital shower. The ceiling was skimmed then all the walls were fully tiled. Finally the new furniture with a bespoke mirror, shower fittings, glass panel and towel radiator were installed. Electrical work carried out by Nick at Fusion Electrical & Property Services

© Andrew Hindes Interiors 2019.